Rubaya Implementation Trip | Week II Field Notes

During the second week of construction, the team poured all column and strip footings, built formwork for column lifts and set up scaffolding. From the technical end, everything is going as scheduled and the team has been doing a terrific job of problem solving across a Whatsapp group. A lot of it has been possible because of Mira and Patrick’s ability to address problems on the site like material delivery issues and misinterpretation of CMU block design. In addition, the efforts of team members here in NY to provide structural consulting and design specs to the travelling members as they run into cement mix and other questions has been vital for construction to proceed.

Feature Photo: Finished footing (left) and start of scaffolding (right)